Theses most similar to those of author Coste, Amelie, 1982-

Schedule and cost estimate for an innovative Boston Harbor concert hall (2004) read it

  • Advisor: Jerome J. Connor, Jr.
  • Department of Mechanical Engineering
  • Advisor: Robert D. Logcher
  • Department of Civil and Environmental Engineering
  • Advisor: Fred Moavenzadeh. -- Co-supervised by James L. Paddock
  • Department of Civil and Environmental Engineering
  • Advisor: Eduardo Catalano
  • Department of Architecture
  • Advisor: Wenger, Edward (Edward Allen)
  • Department of Architecture