Theses most similar to Simulation of real-time scheduling policies in multi-product, make-to-order semiconductor fabrication facilities (Yong, Meow Seen, 1977-; 2001) read it
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
- Advisor: Larry Lapide
- Engineering Systems Division
Multiple-part-type systems in high volume manufacturing : Kanban System design for automatic production scheduling
Lee, Kaizhao (2008)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Multiple-part-type production scheduling for high volume manufacturing (token-based approach)
Ng, Sing Hng (2008)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Multiple-part-type systems in high volume manufacturing : long-term capacity planning & time-based production control
Hua, Xi (2007)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Multi-echelon multi-product inventory strategy in a steel company
Iocco, Juan D. (Juan Domingo) (2009)
- Advisor: Amanda Schmitt
- Engineering Systems Division
Production and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban design
Rizvi, Syed Zia Abbas (2009)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Design of a demand driven multi-item-multi-stage manufacturing system : production scheduling, WIP control and Kanban implementation
Zhou, Xiaoyu, M. En (2009)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Improved inventory and production control on a multi-product production line : seasonality analysis, inventory supermarket, and Kanban design
Zhong, Yua (2009)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Raw material inventory strategy for make-to-order manufacturing
Chandra, Vikas; Tulley, Michael (2016)
- Advisor: Fredrik Eng Larsson
- Engineering Systems Division; Supply Chain Management Program