Theses most similar to Setting optimal production lot sizes and planned lead times in a job shop system (Yuan, Ron; 2013) read it

  • Advisor: Anna C. Thornton
  • Department of Mechanical Engineering
  • Advisor:
  • Department of Mechanical Engineering
  • Advisor: Stephen C. Graves
  • Operations Research Center
  • Advisor: Stephen C. Graves
  • Computation for Design and Optimization Program
  • Advisor: Stephen C. Graves
  • Department of Electrical Engineering and Computer Science