Theses most similar to Addressing equipment set-up time and manufacturing cost through real time inline inspection in tantalum wire manufacturing (González, Carlos A. (Carlos Alberto), 1972-; 2004) read it

  • Advisors: Daniel Whitney; David Simchi-Levi Roy Welsc
  • Department of Mechanical Engineering
  • Advisors: Duane Boning; John H. Lienhard, V, Roy E. Welsch
  • Department of Electrical Engineering and Computer Science
  • Advisors: Daniel Whitney; John H. Lienhard, V, Roy E. Welsch
  • Department of Mechanical Engineering
  • Advisors: David E. Hardt; Donald S. Boning Duane S. Boning
  • Department of Mechanical Engineering
  • Advisors: David E. Hardt; Donald S. Boning Duane S. Boning
  • Department of Mechanical Engineering
  • Advisors: David Hardt; David Simchi-Levi Roy Welsc
  • Department of Mechanical Engineering