Theses most similar to Equipment protective capacity optimization using discrete event simulation (Newlin, Anthony W; 2000) read it
Management and scheduling aspects of increasing flexibility in manufacturing
Austin, Amy Beth (1993)
- Advisors: Erik Brynjolfsson And Sinan Aral; Stanley B. Gershwin
- Department of Mechanical Engineering
Improving equipment performance through queueing model applications
Capelle, Michael J. (Michael John) (1995)
- Advisor: Charles H. Fine
- Department of Electrical Engineering and Computer Science
Fab cycle time improvement through inventory control : a wafer starts approach
Ward, Matthew John (2007)
- Advisors: Deborah J. Nightingale; Stephen C. Graves
- Engineering Systems Division
- Advisors: Duane Boning; Stephen C. Graves
- Department of Mechanical Engineering
Study on the performance improvements of electrical domestic appliance factory
Kasan Hidayat, Andy Darwin (2007)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
Production management policies in a multiple product semiconductor fabrication facility
Perrin, Susan E. (Susan Elaine) (1997)
- Advisor: Stanley B. Gershwin
- Department of Mechanical Engineering
- Advisor: David Cochran
- Department of Mechanical Engineering
- Advisor: Dr. Kamal Youcef-Toumi
- Department of Mechanical Engineering
The development of a decision support software application to improve capital equipment management
Selvik, Eric C. (Eric Charles), 1970- (1999)
- Advisors: Antón García-Abril; Duane Boning
- Department of Mechanical Engineering
Process time variation reduction in a microprocessor burn-in operation
Emmert, Terence G. (Terence Gordon), 1966- (2001)
- Advisors: David Simchi-Levi Roy Welsc; Donald B. Rosenfield Joseph R. Sussman
- Department of Civil and Environmental Engineering