Theses most similar to Schedule and cost estimate for an innovative Boston Harbor concert hall (Coste, Amelie, 1982-; 2004) read it
The development of an alternate building system based on the use of an existing standardized component : precast, prestressed, hollow-core concrete slab
Simovic, Laszlo (1984)
- Advisor: Waclaw P. Zalewski
- Department of Architecture
- Advisor: Carl Koch
- Department of Architecture
- Advisor: Walter R. MacCornack
- Department of Architecture
Design and analysis of a concrete modular housing system constructed with 3D panels
Sarcia, Sam Rhea, 1982- (2004)
- Advisor: Jerome J. Connor, Jr.
- Department of Mechanical Engineering
- Advisor: Robert D. Logcher
- Department of Civil and Environmental Engineering
A framework for an initial development cost model for single-family dwellings.
Rossow, Janet Ann Koch (1971)
- Advisor: Fred Moavenzadeh. -- Co-supervised by James L. Paddock
- Department of Civil and Environmental Engineering
Step-down apartment units in Diamond Heights, San Francisco, California by Ernest A. Grunsfeld, III.
Grunsfeld, Ernest A. (Ernest Alton) (1952)
- Advisor: Pietro Belluschi
- Department of Architecture
- Advisor: Eduardo Catalano
- Department of Architecture
- Advisor: Wenger, Edward (Edward Allen)
- Department of Architecture
Construction management : preliminary cost estimate and scheduling of MIT's Civil and Environmental Engineering building
Deshpande, Pushkar V. (Pushkar Vijaykumar), 1977- (1999)
- Advisor: Jerome J. Connor, Jr.
- Department of Civil and Environmental Engineering